News

2016-11-18

Retrofitting Hoegh Delhi

Kockumation makes a LEVELMASTER pre-survey prior to installation

Kockumation was awarded a contract for retrofitting the remote level gauging system onboard the PCTC Hoegh Delhi. Kockumation offered a turnkey package where the existing pressure sensors are removed and replaced with the electro-pneumatic system LEVELMASTER H8. 

Kockumation made a one day pre-survey at the port of Emden. During the inspection we were able to set all details. The major part of installation will take place at sea. 

Read more about LEVELMASTER here

Theme picker

News archive

2017-06-01

NOR-SHIPPING 2017
123